Silver Ore Grinding Plant

Silver Ore Grinding Plant

Silver Ore Grinding Plant operating procedures

The Silver Ore Grinding Plant should be operated by a dedicated person to ensure the normal operation of the equipment.

Boot check

Before starting the machine, carefully remove the dirt inside and outside the equipment, check whether the sealing of the system connection is reliable, whether the fastening bolts of each component are fastened, grease is added to the grease nipple, and the running parts are pulled by hand to observe whether there is abnormal sound. After all normal Enter the boot process. The parameters are maximized to maximize the performance of the equipment.

Choose the best parameters

  • 1. Set the speed of the classifier and the damper to a certain value in advance, then adjust the feeding speed, and record the current of the grinding motor, and measure a series of data for comparison.
  • 2. The electromagnetic vibration current and the damper are preset to a certain value, then the speed of the classifier is adjusted, and a series of data is measured for comparison.
  • 3. Set the classifier speed and the feed electromagnetic vibration current to a certain value in advance, adjust the opening degree of the damper, measure a series of data for comparison, and select a group with a fineness range meeting the requirements and a higher output. For the basis of future production.

Adjustment auxiliary system

  • 1. Specific indicators of lithium-based oils and fats: drop point 170-230 ° C; temperature range 50 ° C – + 130 ° C; speed range: high speed; mechanical stability: excellent.
  • 2. The lubrication of the shifting gear is as specified in the gearbox manual.
  • 3. If the equipment box is continuously operated 24 hours a day, the refueling time should be shortened appropriately. According to the size of the bearing and the number of bearings in the same part (single or double), the amount of grease added each time is 3-15 grams. If the gap between the bearing cap and the shaft is found to have grease leakage, it means excessive fatening, which should be appropriately reduced.
  • 4. If the feeding system, the closing fan, the discharging auger, etc. are lubricated by the cycloidal pin wheel mechanism and the fan, please follow the provisions in the corresponding manual provided.