Putty Powder Vertical Mill

Abstract

Putty Powder Vertical Mill common faults and solutions Too thick or too fine Cause: The air volume is not appropriate, or the analyzer speed has not been adjusted properly. Approach: Adjust the analyzer speed. The product …

Putty Powder Vertical Mill common faults and solutions

Too thick or too fine

Cause: The air volume is not appropriate, or the analyzer speed has not been adjusted properly.

Approach:

The host stops frequently, the machine temperature rises, and the blower current drops.

the reason:

Too much feed, a large amount of powder in the main unit blocked the air duct.

The pipe is not exhausted. The circulating air flow repeatedly rubs against the wall of the pipe to heat, so that the pipe wall is wet and the powder is bonded to the pipe wall, and finally the pipe is blocked.

Approach:

Remove air duct powder and reduce feed.

Open the residual air duct valve, the feed moisture should be controlled below 6%.

The host sounds loud and vibrates

the reason:

Approach:

Blower vibration

the reason:

Approach:

Transmission and analyzer heating

the reason:

Approach:

Roller device into the powder

the reason:

Approach:

Manual fuel pump has poor oil output

Cause: Oil has been cut around the piston chamber.

Treatment: Push the grease above to the piston cavity.

Conclusion

To offer customers more timely service and solve their puzzles during operation of production lines, we push out the strategy of "Globalization & Localization". No matter where the project may be, we can always offer timely service and effective solutions. So if you have any demand for crushing or grinding, please contact us with no hesitation.

Submit Your Request Here

Hot Sale