Have questions? SBM sales representatives are available for live chat now WELCOME TO SBM MACHINERY!

Graphite Mineral Milling Machine

Graphite Mineral Milling Machine

Graphite Mineral Milling Machine operation

Graphite Mineral Milling Machine starts

Before starting, check whether all the inspection doors are closed tightly. Check whether the jaw gap of the crusher meets the feed size. Adjust the speed of the analyzer to reach the approximate product size. Finally, press in order to boot. The simple operation sequence is as follows: start: hoist → crusher → analysis machine → fan → host → feeder.

  • 1. Start the bucket elevator;
  • 2. Start the jaw crusher;
  • 3. After the material in the warehouse is stored, start the analysis machine;
  • 4, start the blower (empty load start, then load after normal operation);
  • 5. Start the main machine of Graphite Mineral Milling Machine, and start the electromagnetic vibration feeder immediately after starting the host. At this point, the Graphite Mineral Milling Machine grinding work is the beginning.

Graphite Mineral Milling Machineing Machine

When the Graphite Mineral Milling Machine is stopped, the machines should be shut down in the following order: The order of the Graphite Mineral Milling Machine is: feeder → main unit → blower → analyzer.

  • 1. Close the feeder to stop feeding;
  • 2. Stop the host after about one minute;
  • 3. Stop the blower after blowing off the residual powder;
  • 4. Finally shut down the analyzer.

Note: After the hoist transports the material to the silo for a certain amount, stop the crusher and then stop the lifting. This item should be changed by the stock amount.

Get Price And Support

Simply complete the form below, click submit, you will get the price list and a SBM representative will contact you within one business day. Please also feel free to contact us by email or phone. ( * Denotes a required field).